Welcome to the Australian Ford Forums forum.

You are currently viewing our boards as a guest which gives you limited access to view most discussions and inserts advertising. By joining our free community you will have access to post topics, communicate privately with other members, respond to polls, upload content and access many other special features without post based advertising banners. Registration is simple and absolutely free so please, join our community today!

If you have any problems with the registration process or your account login, please contact us.

Please Note: All new registrations go through a manual approval queue to keep spammers out. This is checked twice each day so there will be a delay before your registration is activated.

Go Back   Australian Ford Forums > General Topics > The Pub

The Pub For General Automotive Related Talk

Reply
 
Thread Tools Display Modes
Old 06-10-2021, 08:47 PM   #1
T3rminator
FF.Com.Au Hardcore
 
T3rminator's Avatar
 
Join Date: Jul 2005
Location: Melbourne
Posts: 6,931
Default Temporary road work speed sign rules (Vic)

Just after some clarity on the rules (Vic) for temporary speed signs set up at road works.

My understanding is that you need to obey the temporary speed signs until the road work ends AND you see the next speed sign. But what if the road work has ended and the official road speed sign is not seen for some distance? Is there a distance limit before you can resume normal speed legally?

Eastern Freeway, outbound, normally 100kmh, is getting some road works done. Its 40kmh at a small section. After the road work ends, there is no temporary speed sign to go back to 100kmh, and the next official speed sign is not seen for a good 1km or so I'd say. Its a pretty **** scenario, some cars remain at 40kmh whilst others are flying past at 100kmh. Its a difference between losing your license or not.
__________________
~~~~~~~~~~~~~~


Rides (past and present)
Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual
Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m)

AFF motto - If contrary views trigger, please use ignore button.
T3rminator is offline   Reply With Quote Multi-Quote with this Post
Old 06-10-2021, 09:05 PM   #2
simon varley
FF.Com.Au Hardcore
 
Join Date: Nov 2009
Posts: 2,887
Technical Contributor: For members who share their technical expertise. - Issue reason: Bringing sanity to the Everest threads. 
Default Re: Temporary road work speed sign rules (Vic)

legally you are correct. Often the End sign is combined with a new speed limit sign but otherwise, legally you can't speed up until you do see one

in practise though you will have idiots up your **** before you've gone 50 metres so the safe option is often to speed up early

similar to slowing down. Often the signs are so far before the works that you drive kms at low speed risking others rear ending you so the safe (not legal) thing to do is to wait to slow down

There needs to be better management and consistency on temp roadworks signs imo. Not least to remove them when the work is complete or nobody is actively working. We do have one good set near here where it's 40mh when they are actively working but 60kmh when not reflecting the roadworks themselves are a hazard compared to the normal 80kmh limit, but also reflecting that worker safety is important when they are actually present
simon varley is online now   Reply With Quote Multi-Quote with this Post
Old 06-10-2021, 09:10 PM   #3
galaxy xr8
Giddy up.
 
galaxy xr8's Avatar
 
Join Date: Dec 2004
Location: Kramerica Industries.
Posts: 15,637
Default Re: Temporary road work speed sign rules (Vic)

Best thing to do in this scenario is keep left or stay in the left lane (if dual lane) and let others do as they please or speed by if they feel the need to take the risk of Mr plod sitting and waiting eagerly up ahead.
galaxy xr8 is offline   Reply With Quote Multi-Quote with this Post
2 users like this post:
Old 06-10-2021, 09:22 PM   #4
T3rminator
FF.Com.Au Hardcore
 
T3rminator's Avatar
 
Join Date: Jul 2005
Location: Melbourne
Posts: 6,931
Default Re: Temporary road work speed sign rules (Vic)

Yeh...I know what is sensible (go with the flow)...and I know what is to lose your license.

You occasionally also see signs get left out in the evenings, when there are no works going on. Either someone taking the **** or by accident.

40kmh in a 60 zone is not so bad. But 40kmh in the 100 is just crazy.
__________________
~~~~~~~~~~~~~~


Rides (past and present)
Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual
Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m)

AFF motto - If contrary views trigger, please use ignore button.
T3rminator is offline   Reply With Quote Multi-Quote with this Post
2 users like this post:
Old 06-10-2021, 10:17 PM   #5
lincolnland
Regular Member
 
Join Date: Jun 2016
Posts: 107
Default Re: Temporary road work speed sign rules (Vic)

Often this issue is duration of works. Long term works require different tmp's (traffic management plans) to short term works. Likewise vicroads controlled roads and council controlled roads. Local gov or council roads have different tmp's to vicroads controlled roads. Setup time for the tmp depends on the length in metres or kms of the works, and the duration of the works. Where a major road upgrade on a vicroads road is happening long term works are signed (speed reduction etc) + increase or return to speed using a formula known in the trade. They leave the signs out permanently until and often after works are completed as it's quicker than setup or packup times of all the signage each day. Its also about protecting the those working in the trafficable corridor. We all know how ridiculous it is doing 40km/h at 3am with zero other cars on the road and its normally 100kmh road. What isn't known is are there workers out of sight in the median, or operating anywhere within the road reserve? Because we dont see them doesnt mean they arent there. Likewise, mobile road works of short duration use mobile attenuators as tempary mobile crash absorbing devices in conjunction with reduced speed limits. Another scenario where contractor traffic management companies may only place signage along the left hand lane of a multilane traffic corridor. Is it legal? No - vicroads require both lanes on approach to be signed as per the tmp. Picture driving along a hwy, you miss the only 40kmh sign on the left hand verge, you're driving in the right hand lane past a semi, at what you think is a legal 100kmh rd. Coupler km up the road vicpol hwy car pulls you over. Instant loss of licence for many months bc you didnt see a roadworks speed reduction sign in the left hand lane as it was obscured by a truck and there were no signs on the right hand verge. The tmp wasnt setup correctly or legally, but you still loose your license. Its not fair nor readonable. But it happens every day. Ignorance is no defence in the eyes of the law. Its crap. It fact.
lincolnland is offline   Reply With Quote Multi-Quote with this Post
3 users like this post:
Old 06-10-2021, 10:28 PM   #6
Ben73
FF.Com.Au Hardcore
 
Ben73's Avatar
 
Join Date: Jul 2010
Location: NSW
Posts: 4,339
Default Re: Temporary road work speed sign rules (Vic)

I believe more people would obey road work speed limits if they were more reasonable lengths. The amount of speed restrictions that start 1km+ before any hazard and finish 1km+ after the last hazard is insane.
The whole protecting you from rocks on the road is bull in many situations.

Example, right now the speed limit on the NE Hwy at Ravensworth has dropped from 100 to 60 due to bridge works.
The lanes have slightly narrowed so fair enough on the lower limit. But they have the low speed start well before and continue well after the bridge. It has been like this for more than I month and even though I drive past regularly I've never seen a single person anywhere near the worksite.

If people are working, sure extend the speed restriction, but at 2am I don't want to be driving along slowly once I'm past the hazard. No matter what time of day it is I almost always have someone flying up behind me at 100 while I'm doing 60.
Ben73 is offline   Reply With Quote Multi-Quote with this Post
4 users like this post:
Old 06-10-2021, 10:35 PM   #7
lincolnland
Regular Member
 
Join Date: Jun 2016
Posts: 107
Default Re: Temporary road work speed sign rules (Vic)

1km before the works zone is too allow traffic to slow without causing nose to tail smashes. Not saying i agree with it. The amount of useless absent minded drivers on the road distracted be everything and anything who dont slow or drive to the conditions blah blah blah... the setup and distances and speeds are determined by vicroads if its a viceoads controlled rd. They have to allow for the lowest form of driver.
lincolnland is offline   Reply With Quote Multi-Quote with this Post
Old 07-10-2021, 08:45 AM   #8
Vesper Martini
FF.Com.Au Hardcore
 
Vesper Martini's Avatar
 
Join Date: Oct 2008
Location: Victoria
Posts: 7,854
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by T3rminator View Post
Yeh...I know what is sensible (go with the flow)...and I know what is to lose your license.

You occasionally also see signs get left out in the evenings, when there are no works going on. Either someone taking the **** or by accident.

40kmh in a 60 zone is not so bad. But 40kmh in the 100 is just crazy.
In Rural works on the Maroondah highway I've known them to be left out over the weekend.

Funny one of the workers must have left his Holden Captiva parked there all weekend too, it had these funny spotlights on the front for spotting wildlife no doubt...
__________________
______________________________
2015 Territory Titanium RWD Diesel - SOLD
2016 BMW X5 xdrive 30D Msport
Seadoo Challenger 210SE 310HP
Vesper Martini is offline   Reply With Quote Multi-Quote with this Post
Old 07-10-2021, 09:11 AM   #9
T3rminator
FF.Com.Au Hardcore
 
T3rminator's Avatar
 
Join Date: Jul 2005
Location: Melbourne
Posts: 6,931
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by Vesper Martini View Post
In Rural works on the Maroondah highway I've known them to be left out over the weekend.

Funny one of the workers must have left his Holden Captiva parked there all weekend too, it had these funny spotlights on the front for spotting wildlife no doubt...
Should be a rule that such signs need to have an active beacon to show it is being used.

Burwood Hwy is getting some works done, during the day its 40, evenings 60, but a couple of evenings the 40s have been left out.

Have seen a cop pull someone over on that stretch during the day when works were being carried out. They were sitting in front of a parked escavator, so first person that went pass and disobeyed the limit....bam....

Quote:
Originally Posted by lincolnland View Post
1km before the works zone is too allow traffic to slow without causing nose to tail smashes. Not saying i agree with it. The amount of useless absent minded drivers on the road distracted be everything and anything who dont slow or drive to the conditions blah blah blah... the setup and distances and speeds are determined by vicroads if its a viceoads controlled rd. They have to allow for the lowest form of driver.
Can certainly understand having the limits placed well before the road works. As you said, gives time for people to slow down, and also as works move along it would be unrealistic to keep moving those signs every time. Its more after the road works that seems a bit silly sometimes.
__________________
~~~~~~~~~~~~~~


Rides (past and present)
Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual
Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m)

AFF motto - If contrary views trigger, please use ignore button.
T3rminator is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 07-10-2021, 11:54 AM   #10
FoxtrotGolfXray 5.0
Donating Member
Donating Member3
 
FoxtrotGolfXray 5.0's Avatar
 
Join Date: Mar 2007
Location: Heading thru Hell (Corner)
Posts: 8,349
Technical Contributor: For members who share their technical expertise. - Issue reason: Willingly providing technical info and documents, despite glitches. 
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by T3rminator View Post
Have seen a cop pull someone over on that stretch during the day when works were being carried out. They were sitting in front of a parked escavator, so first person that went pass and disobeyed the limit....bam....
Wish Mr and Mrs Plod would do this on the road works to the west of Sale, atm. This is work associated with finishing off the duplication of the Princes (note only one 's' for those who still pronounce it like the female version ) Highway duplication between Traralgon and Sale. The other week when I was heading in to site, they had already started excavation work of the new road base and were placing cement barriers between the current road and the new road works, so there was a 40km/h zone, which makes sense. Either side of that was a 60km/h zone. I was literally the only car doing the speed limit in that zone, with most cars passing me at around 100km/h. The State Revenue Office could have made a killing!
__________________
Labels are for jars, not for people.

Life is a journey, not a destination.

~~~~~~~~~~~~~~

Daily: 2013 FGII EcoLPi in Winter White
Play: 2015 FG X XR8 in Emperor Show' N Shine thread

Gone, but not forgotten: 2015 SZII petrol Titanium Territory in Emperor
FoxtrotGolfXray 5.0 is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 07-10-2021, 12:06 PM   #11
T3rminator
FF.Com.Au Hardcore
 
T3rminator's Avatar
 
Join Date: Jul 2005
Location: Melbourne
Posts: 6,931
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by FoxtrotGolfXray 5.0 View Post
Wish Mr and Mrs Plod would do this on the road works to the west of Sale, atm. This is work associated with finishing off the duplication of the Princes (note only one 's' for those who still pronounce it like the female version ) Highway duplication between Traralgon and Sale. The other week when I was heading in to site, they had already started excavation work of the new road base and were placing cement barriers between the current road and the new road works, so there was a 40km/h zone, which makes sense. Either side of that was a 60km/h zone. I was literally the only car doing the speed limit in that zone, with most cars passing me at around 100km/h. The State Revenue Office could have made a killing!
Off you go Foxy.... and please upload the video after

__________________
~~~~~~~~~~~~~~


Rides (past and present)
Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual
Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m)

AFF motto - If contrary views trigger, please use ignore button.
T3rminator is offline   Reply With Quote Multi-Quote with this Post
Old 07-10-2021, 12:09 PM   #12
FTE217
T3/Sprint8
Donating Member2
 
FTE217's Avatar
 
Join Date: Jan 2005
Location: Australia
Posts: 16,612
Default Re: Temporary road work speed sign rules (Vic)

Driving in Vic/more so Melb is like playing in the Squid Game
__________________
Tickfords T3/TS50 '02
Sprint8 manual Sept 24 '16
Daily Macan GTS
"Don't believe everything you read on the internet. Abraham Lincoln"
FTE217 is offline   Reply With Quote Multi-Quote with this Post
Old 07-10-2021, 12:23 PM   #13
Itsme
Experienced Member
 
Itsme's Avatar
 
Join Date: Sep 2006
Location: Australasia
Posts: 7,703
Default Re: Temporary road work speed sign rules (Vic)

No matter what you think obey the signs otherwise cop a a fine or you could lose your licence like what happened to my mate, believe me going to court to contest it will be useless as the magistrate is bound by the law to take away your licence.
Itsme is offline   Reply With Quote Multi-Quote with this Post
2 users like this post:
Old 07-10-2021, 12:26 PM   #14
FoxtrotGolfXray 5.0
Donating Member
Donating Member3
 
FoxtrotGolfXray 5.0's Avatar
 
Join Date: Mar 2007
Location: Heading thru Hell (Corner)
Posts: 8,349
Technical Contributor: For members who share their technical expertise. - Issue reason: Willingly providing technical info and documents, despite glitches. 
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by T3rminator View Post
Off you go Foxy.... and please upload the video after

My old work colleague (as in he used to work with me, but has now retired. But he is old in age too ), who I shared a ride to work with, used to say that I missed my calling and should have been a copper with all of the things wrong I noticed people doing on our roads.

I think that was just his polite way of saying I shouldn't comment on his driving skills (or lack thereof!).
__________________
Labels are for jars, not for people.

Life is a journey, not a destination.

~~~~~~~~~~~~~~

Daily: 2013 FGII EcoLPi in Winter White
Play: 2015 FG X XR8 in Emperor Show' N Shine thread

Gone, but not forgotten: 2015 SZII petrol Titanium Territory in Emperor
FoxtrotGolfXray 5.0 is offline   Reply With Quote Multi-Quote with this Post
3 users like this post:
Old 07-10-2021, 12:40 PM   #15
T3rminator
FF.Com.Au Hardcore
 
T3rminator's Avatar
 
Join Date: Jul 2005
Location: Melbourne
Posts: 6,931
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by Itsme View Post
No matter what you think obey the signs otherwise cop a a fine or you could lose your licence like what happened to my mate, believe me going to court to contest it will be useless as the magistrate is bound by the law to take away your licence.
Yep. Pretty hefty price to pay for something that may seem like an "innocent" mistake. Fine, Court costs, lawyer costs, not being able to drive, then having to deal with car insurance once you get your licence back.
__________________
~~~~~~~~~~~~~~


Rides (past and present)
Current: 2004 Ford Falcon 5.4L 3v Barra 220, Manual
Past: Mitsubishi Sigma (m), Toyota Seca (m), Toyota Seca SX (m), Toyota Vienta V6 (m), Toyota Soarer 4L v8 (a), BA XR8 ute (m), T3 TE50 (m), BMW Z4 (m)

AFF motto - If contrary views trigger, please use ignore button.

Last edited by T3rminator; 07-10-2021 at 12:45 PM.
T3rminator is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 07-10-2021, 05:58 PM   #16
lincolnland
Regular Member
 
Join Date: Jun 2016
Posts: 107
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by T3rminator View Post
Should be a rule that such signs need to have an active beacon to show it is being used.

Burwood Hwy is getting some works done, during the day its 40, evenings 60, but a couple of evenings the 40s have been left out.

Have seen a cop pull someone over on that stretch during the day when works were being carried out. They were sitting in front of a parked escavator, so first person that went pass and disobeyed the limit....bam....



Can certainly understand having the limits placed well before the road works. As you said, gives time for people to slow down, and also as works move along it would be unrealistic to keep moving those signs every time. Its more after the road works that seems a bit silly sometimes.
Agreed!
lincolnland is offline   Reply With Quote Multi-Quote with this Post
Old 07-10-2021, 06:08 PM   #17
lincolnland
Regular Member
 
Join Date: Jun 2016
Posts: 107
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by Itsme View Post
No matter what you think obey the signs otherwise cop a a fine or you could lose your licence like what happened to my mate, believe me going to court to contest it will be useless as the magistrate is bound by the law to take away your licence.
Yep it isnt fair nor is it reasonable. Victorian politicians have a lot to answer for when reviewing road laws and subsequent penalties.
lincolnland is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 07-10-2021, 07:51 PM   #18
Tassie f100
FF.Com.Au Hardcore
 
Join Date: Jul 2012
Posts: 3,878
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by T3rminator View Post
Yeh...I know what is sensible (go with the flow)...and I know what is to lose your license.

You occasionally also see signs get left out in the evenings, when there are no works going on. Either someone taking the **** or by accident.

40kmh in a 60 zone is not so bad. But 40kmh in the 100 is just crazy.
Not in Vic but in Tassie,Bloke going off the handle on talkback radio.He had travelled through a bit of roadworks at about 5 am,no one around etc so he was skipping along at about 85 in a 40 roadwork zone.Cop on the way back from a job pulls him over,books him,then tells him more than 40 kmh over the limit is automatic on the spot licence gone,so he gets told to lock up the car and start walking.NOT a happy lad.
Tassie f100 is offline   Reply With Quote Multi-Quote with this Post
2 users like this post:
Old 07-10-2021, 09:22 PM   #19
hayseed
Guest
 
Join Date: Aug 2018
Posts: 1,892
Default Re: Temporary road work speed sign rules (Vic)

My Mother In Laws car has that Speed sign recognition system. She Tells Me if there's no sign at the end of roadworks (or It's Blown over) system goes Nuts until it sees another speed sign..
hayseed is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 07-10-2021, 11:25 PM   #20
jstanovic
FF.Com.Au Hardcore
 
Join Date: Feb 2013
Location: Perth
Posts: 830
Default Re: Temporary road work speed sign rules (Vic)

There's some long term roadworks near me on a 100kph highway. Speed has been reduced to 80kph, most people ignored it and did 100kph anyway. UNTIL the permanent speed camera was readjusted to 80kph about 4 months ago, it was flashing overtime day and night, coming the opposite way you would see it flash 4 or 5 times in the minute it took to drive past it. Took about 2 months for the cars to all be doing 80kph hahaha!!!
jstanovic is offline   Reply With Quote Multi-Quote with this Post
Old 07-10-2021, 11:49 PM   #21
Itsme
Experienced Member
 
Itsme's Avatar
 
Join Date: Sep 2006
Location: Australasia
Posts: 7,703
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by simon varley View Post
legally you are correct. Often the End sign is combined with a new speed limit sign but otherwise, legally you can't speed up until you do see one

in practise though you will have idiots up your **** before you've gone 50 metres so the safe option is often to speed up early

similar to slowing down. Often the signs are so far before the works that you drive kms at low speed risking others rear ending you so the safe (not legal) thing to do is to wait to slow down

There needs to be better management and consistency on temp roadworks signs imo. Not least to remove them when the work is complete or nobody is actively working. We do have one good set near here where it's 40mh when they are actively working but 60kmh when not reflecting the roadworks themselves are a hazard compared to the normal 80kmh limit, but also reflecting that worker safety is important when they are actually present
Sometimes speed restrictions are permantly set during road works due to conditions of the roads regardless whether workers are there or not.
Itsme is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 08-10-2021, 07:20 AM   #22
Rallye Sport
RS The Faster Fords
 
Rallye Sport's Avatar
 
Join Date: Feb 2014
Location: Westralia
Posts: 1,694
Default Re: Temporary road work speed sign rules (Vic)

The signs aren't just there for the workers, they're left out after hours due to changed road conditions, narrow lanes, loose surfaces etc.
Just saving the numpties from themselves. If it were up too me I'd let them go and let Darwins theory prove itself.
__________________
Escort RS2000 Restored factory a/c and alloys.
TD Cortina Unrestored 35 000km 6cyl manual.
Mk1 GT Cortina Project.
FG XR50 Daily.
Rallye Sport is offline   Reply With Quote Multi-Quote with this Post
This user likes this post:
Old 08-10-2021, 09:07 AM   #23
Vesper Martini
FF.Com.Au Hardcore
 
Vesper Martini's Avatar
 
Join Date: Oct 2008
Location: Victoria
Posts: 7,854
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by Rallye Sport View Post
The signs aren't just there for the workers, they're left out after hours due to changed road conditions, narrow lanes, loose surfaces etc.
Just saving the numpties from themselves. If it were up too me I'd let them go and let Darwins theory prove itself.
Yes understand like an excavator left on the side of the road, some numptie could/would drive into it..

but I have seen plenty of examples where the signs are out and here is no hazzard.

even worse Ive encountered traffic redirect signs directing traffic though other towns adding 30mins to a Journey when the path ahead is clear.
__________________
______________________________
2015 Territory Titanium RWD Diesel - SOLD
2016 BMW X5 xdrive 30D Msport
Seadoo Challenger 210SE 310HP
Vesper Martini is offline   Reply With Quote Multi-Quote with this Post
Old 09-10-2021, 01:59 PM   #24
roKWiz
Cabover nut
 
roKWiz's Avatar
 
Join Date: Aug 2015
Location: Onsite Eastcoast
Posts: 11,324
Default Re: Temporary road work speed sign rules (Vic)

Quote:
Originally Posted by T3rminator View Post
Yeh...I know what is sensible (go with the flow)...and I know what is to lose your license.

You occasionally also see signs get left out in the evenings, when there are no works going on. Either someone taking the **** or by accident.

40kmh in a 60 zone is not so bad. But 40kmh in the 100 is just crazy.
Sounds like the current roadworks coming down the big hill into Yackandandah, first blind corner (80km) there's a 40km sign. With last weeks winds blowing down the signs most days made it dodgy to say the least especially adding caravan tourist into the mix.
__________________
heritagestonemason.com/Fordlouisvillerestoration
In order that the labour of centuries past may not be in vain during the centuries to come...... D. Diderot 1752

roKWiz is offline   Reply With Quote Multi-Quote with this Post
Reply

Thread Tools
Display Modes

Forum Jump


All times are GMT +11. The time now is 11:20 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Other than what is legally copyrighted by the respective owners, this site is copyright www.fordforums.com.au
Positive SSL